PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Core Drilling and installing conduit at the 3rd Floor (Jury Box 370) (800x600).jpg Cut beam pockets at the roof of Stair -4 Facing East (800x600).jpg Duct Work delivery for the 1st Floor Facing East(800x600).jpg Installed electrical wire at the 3rd Floor Facing East (800x600).jpg Installed steel plates at the perimeter of the roof to support the metal decking (800x600).jpg Installing duct work at the 1st Floor Facing North (800x600).jpg Installing Top track at the 3rd Floor Facing East (800x600).jpg Metal Clips around the perimeter of the roof (South Elevation) (800x600).jpg Metal clips aroung the perimeter of the 3rd Floor Facing West (800x600).jpg
Previous pageNext page Installed steel plates at the perimeter of the roof to support the metal decking (800x600)
Installed steel plates at the perimeter of the roof to support the metal decking (800x600)